Entrance Automation

Sliding Gate Automation

Gates, doors and shutters that open themselves — sized to the opening, wired for Indian power, and installed by the people who supply them.

2 products

Every entrance is a different machine.

A sliding gate, a swing gate, a commercial glass door and a rolling shutter share one idea and almost no hardware. That is why every OTODOR automation job starts with a site survey, not a cart.

Not sure which system your entrance needs?

Send us the opening — width, weight and how often it runs — and we size it before you order.

Talk to us
Compare the range

Every system, side by side.

Why OTODOR Entrance Automation
Sized to your opening.Not to a price list.
Installed.Not delivered.
Opens in a power cut.Manual release on every motor.
16 years of spares.Behind every install.

Frequently asked questions

Sliding or swing — which do I need?

It is decided by your existing gate, not by preference. A gate that rolls sideways along the boundary wall is a sliding gate; one that opens on hinges like a door is a swing gate. Each needs a different motor, mount and safety kit.

How is the right system sized?

By what has to move and how often. For a gate that means weight, span and duty cycle — an undersized motor will work for a season and then fail on duty cycle. For a commercial door or a shutter it means the width of the opening and the traffic through it. We take the measurements during the free survey and size from those.

Does any of this need a three-phase connection?

No. Our gate motors run on a standard 220V single-phase supply. A regular household or shop connection is enough.

What happens in a power cut?

Every OTODOR motor has a manual release, so the gate or door can be opened by hand in seconds — no tools and no technician. Battery backup is available where the gate is the only vehicle access.

Can it be retrofitted to my existing gate?

Usually yes. The gate needs a true, level run and sound hinges or rollers; the survey confirms whether any civil work is needed before automation.

Do you install, or only supply?

We install. Every entrance automation job includes a free site survey before anything is dispatched, a certified welder and technician on the day, and an on-site demo before we leave.

What do I need to keep ready before installation day?

It depends on the system, and each product page carries its own wiring and civil-work checklist. In every case you will need a 220V single-phase point on a dedicated MCB with proper earthing, and the opening itself moving freely by hand before we arrive.

Book a free sitesurvey.

We measure the opening, weigh what has to move and check the run — then quote a system that will still be working in ten years.